Home

Boarshurst Lancashire Loft Storage/Office

11 of 28Boarded to roof 
Plasterboarding installed along knee walls

Plasterboarding has been installed along the knee wall frame up the the roof. To maximise internal roof space the plasterboard is inserted between rafters. Electrical wiring for wall sockets is drawn through the boarding.

Price guide
Contact
0844 562 5880

Conversions in Greater Manchester and Lancashire