| 5 of 28 | 05 | ![]() |
![]() With the electrical cables fixed and the floor joists sitting level in their joist hangers the insulation can then be put in place between the new floor joists. The insulation reduces heat loss from below and prevents any draughts. Loft insulationPrice guide Contact 0870 7575 010 Conversions in Greater Manchester and Lancashire | ||
|
| ||